Flooring Upgrades
11 Jun 2026
Maplebrooke completed floor replacement works within one of areas at Luton Airport. Works were undertaken at night. The old wooden flooring was removed and replaced with the airports new specification. Works were completed to sets of stairs and around existing carpeted areas too.


Office Refurbishment
12 May 2026
We had an office area that needed a full referbishment. We replaced all ceiling tiles, changed the floor, full redecoration and installed new furniture. As the area remained operational we arranged for works to be completed swiftly to ensure we minimised distruption.


Advertisement Change
10 Apr 2026
After successfully completing works previously we changed the Jet2 advertisement on the underpass bridge into Luton Airport. To minimise disruption we arrange for a crane to lift sections of scaffolding over the bridge while pausing traffic for brief periods. Works were completed safer and more efficiently.


New Store Room
10 Apr 2026
We created a new store area within a sortation site for Amazon. Fencing with new racking was installed as per the clients specification. As part of these works we also extended another caged area onsite to allow for additional racking to be installed.


Mansafe Installation
27 Mar 2026
Following similar works completed to a high standard Maplebrooke were tasked with managing the installation of a new fit for purpose Mansafe System with new access ladders to a number of roofs at Luton Airport. The specialist teams designed a bespoke system to suit the requirements of our client.


Lattice Tower
06 Mar 2026
To ensure one of the critical towers are maintained at Luton Airport we were appointed Principal Contractor to complete a full structural survey and remedial works to the tower. Works involved a number of repairs and a full repaint from top to bottom! Luckily the weather was on our side while the works took place


Service Corridor Works
04 Mar 2026
Due to many years neglect we were tasked with installing a new non-slip resin floor to a service corridor within Luton Airport. The works involved removing failed flooring, prepping the surface and installing a resin floor. The area remained operational so we had to ensure works were suitably planned to prevent disruption to the users of the area.


Dock Leveller Works
19 Jan 2026
Maplebrooke removed failed dock leveller signage for Amazon in Redditch. The signage is an important visual for all operatives unloading/ loading vehicles on what equipment can be used. Works were completed around the 24/7 operation. We have since be asked for quoting similar works to other sites


Christmas 25
05 Dec 2025
After another successful year Maplebrooke celebrated 2025 with a Christmas get together in London. Games, food and drinks were all well received by the team.


Firestation Refurbishment
01 Oct 2025
Maplebrooke undertook refurbishment works at London Luton Airport's Fire Station. Works included new Fire Doors throughout, new flooring, new windows and decorative works. Maplebrooke worked with the Fire Station to allow them to still operate daily whilst causing minimal disruption.
Damaged Fire Rated Glass
09 Aug 2025
Maplebrooke were tasked with completing an emergency repair to a piece of damaged glass within London Luton Airport's Lounge. The glass was accidently damaged but as it acts as a fire rated piece of glass we needed to fast track a new piece and install out of hours to minimise disruption and optimise safety.


Pumping Station Works
10 June 2025
We were required to remove the existing Asbestos Roof through a local asbestos contractor and have the area certified for us to enter then complete the refurbishment works which included new roof, facias and guttering. A new metal door set was installed as well


Anti-Slip Stair Treads
23 April 2025
Following a Health & Safety request from one of our clients we were tasked with replacing the anti-slip stair treads used for passengers flying privately. We had a small window to replace these for new custom stair treads in-between a number of scheduled flights.
Metal Door Sets
08 April 2025
Maplebrooke were tasked with replacing a double door set with a new metal door set for one of our clients. Works needed to be completed within the day to secure the area. The doors were manufactured to match the previous set but the openings were reversed to allow for easier access in and out of the Plant Room.


Crash Deck Scaffold
27 Feb 2025
Maplebrooke had to install a crash deck scaffold to allow for two light boxes to be replaced. The scaffold was not used for access but was in place due to the road being operative 24/7. Works were undertaken during multiple shifts to suit the clients needs


Onward Travel Centre
10 Jan 2025
To allow for another project to be undertaken Maplebrooke were tasked with creating a new 'Onward Travel Centre' for the operators at Luton Airport. Works were undertaken in a live airport environment and were to a strict deadline.


International Departure Lounge Works
12 Dec 2024
These works involved removing the existing failed flooring and replacing with a new improved tile. New power points were installed and a new information board was installed for passengers at London Luton Airport.


Maplebrooke Christmas Party
09 Dec 2024
We recently had out Christmas Party at TopGolf In Watford to celebrate the hard work from the team this year. A great evening was had by all. This was a great round up to the year and was thoroughly enjoyed by all.


Removal of Redundant Ductwork
27 Nov 2024
We were required to remove three sections of redundant ductwork to allow for the future installation of a Mansafe System. The works required preparation by our specialist asbestos contractor to allow for the removal of these sections of ductwork.

Internal Hoarding Install
19 Nov 2024
Maplebrooke were tasked with installing a large internal hoarding within the departure lounge of London Luton Airport. The design was carefully considered to ensure the fire strategy was not compromised during the works and that temporary works were suitably managed


Shingle Replacement
09 Nov 2024
One of clients requested that their failed shingle around their offices to be replaced. Old shingle was removed, new supports installed and then it was all backfilled. This simple job has greatly improved the image of the offices


ATM Removal
31 Oct 2024
As part of our ongoing works for Change Group the small project consisted of removing the existing ATM machine and replacing the diabond on the unit. Works were completed out of hours due to being located within a busy environment

Charity Football Day
18th October 2024
Maplebrooke sponsored the Charity Football Day hosted by London Luton Airport in support of their charities. We also entered a team but unfortunately no trophies won this time!


Roof Repairs
13 September 2024
Maplebrooke were tasked with completing essential roof repairs to one of the airside buildings at London Luton Airport. The project involved cleaning the existing roof, re-felting and installing replacement skylights.